New System Commissioning Report
Complete all sections after installation. This is the permanent technical record.
Load from Service Titan
Commission Setup
System Type
1
Job Info & Equipment Installed
✓ Done
Job Info
Outdoor Unit
Indoor Unit / Air Handler
Thermostat
Unit Locations
2
Nitrogen Leak Test
✓ Done
ℹ️ Pressurize with dry nitrogen. Record pressure, hold minimum 15 minutes. Any measurable drop = Fail.
Enter start and end pressure
Before Photos
Manifold — Start Pressure
Manifold — End Pressure
3
Evacuation / Micron Reading
✓ Done
ℹ️ Pull vacuum below 500 µm. Isolate pump. Hold 5 min. Rise ≤1000 µm = Pass. Rise >1000 µm or continuous rise = Fail.
Target (µm)
Achieved (µm)
Enter achieved microns
Start (µm)
End (µm)
Enter decay readings
Micron Gauge Reading (photo)
4
Refrigerant Charge
✓ Done
Subcooling Calculation
5
Static Pressure
✓ Done
Supply
Return
Enter readings
6
Installation Verification
✓ Done
Refrigerant Charge Verified
Lineset Insulated & Sealed
Electrical Connections Torqued
Disconnect Installed & Correct
Condensate Drain Flushed & Tested
Filter Installed (correct size)
Thermostat Programmed & Verified
Equipment Startup Completed
Customer Walk-Through Performed
7
Installation Photos
✓ Done
Completed Installation — Outdoor
Completed Installation — Indoor
Equipment Data Plates
Electrical / Disconnect
Lineset (completed & insulated)
Thermostat (final)